Emergency Shutdowns

Refer to this page daily to check for emergency shutdowns or other events that may affect your operations.

Domestic Water: STEMMLER HALL, EDWARD J.

Service(s) Affected: Domestic Water

Start Date: 05/29/2015

Start Time: 5:30 AM

End Date: 05/30/2015

End Time: 1:30 AM

Building(s) Affected:

Stemmler Hall, Edward J.(Stemmler)
Whole Building Affected: YES


Advisory:
Please be advised that on Friday evening, May 29, 2015 between 5:30 pm and 1:30 am Saturday morning the domestic water will be shut down. This outage is necessary to repair a number of plumbing issues in the building.

EHRS Directive:
No laboratory work with chemical, biological or radioactive materials; or animals is permitted during this shutdown. Water will be unavailable for restrooms, laboratory, and emergency irrigation.




Domestic Water: JOHNSON PAVILION

Service(s) Affected: Domestic Water

Start Date: 05/28/2015

Start Time: 5:30 PM

End Date: 05/29/2015

End Time: 1:30 AM

Building(s) Affected:

Johnson Pavilion(Johnson)
Whole Building Affected: YES


Advisory:
Please be advised that on Thursday evening, May 28, 2015 between 5:30 pm and 1:30 am Friday morning the domestic water will be shut down. This outage is necessary to repair a number of plumbing issues in the building.

EHRS Directive:
No laboratory work with chemical, biological or radioactive materials; or animals is permitted during this shutdown. Water will be unavailable for restrooms, laboratory, and emergency irrigation.




NOTICE:Stemmler Hall Renovation Town Hall Meeting: STEMMLER HALL, EDWARD J.

Service(s) Affected: Whole Building

Notice Date: 05/18/2015

Building(s) Affected:

Stemmler Hall, Edward J.(Stemmler)
Whole Building Affected: YES


Advisory:
Stemmler Hall will be undergoing major interior laboratory and infrastructural renovations over the next 3 years. The project team has scheduled regular Town Hall type meetings to keep building occupants informed during the course of this project. The next meeting is scheduled for May, 20, 2015 at 10:30am in Dunlop Auditorium. If you did not receive notification of the last town hall meeting, please forward your contact information and location in Stemmler to Margo Pietras-Barnes (mpietras@upenn.edu) so that you can be added to our distribution list.

EHRS Directive:
N/A




EMERGENCY:NOTICE:General Exhaust Outage: STELLAR-CHANCE LABORATORIES

Service(s) Affected: HVAC

Notice Date: 05/18/2015

Building(s) Affected:

Stellar-Chance Laboratories(SCL)
Whole Building Affected: YES


Advisory:
Please be advised that the general building exhaust is currently experiencing problems. Two of the five exhaust units that are necessary for proper building operation are down; FRES is on site addressing the problem.

EHRS Directive:
No lab work may be conducted in the affected labs while the exhaust is diminished and fume hoods are in alarm.




NOTICE:Access Control: HOSPITAL OF THE UNIVERSITY OF PENNSYLVANIA,SMILOW CENTER FOR TRANSLATIONAL RESEARCH

Service(s) Affected: Access Control Automatic Features

Notice Date: 05/18/2015

Building(s) Affected:

Hospital of the University of Pennsylvania(HUP)
Whole Building Affected: YES

Smilow Center for Translational Research(TRC)
Whole Building Affected: YES


Advisory:
Please be advised that UPHS is currently experiencing problems with the access control system at various UPHS facilities including the Jordan Medical Education Center and the Smilow Translational Research Center. The problem is with respect to the automatic unlocking features of the system, the service contractor is working on the problem. Individual doors may be opened with your access control card.

EHRS Directive:
N/A




NOTICE:Elevator Improvements: STELLAR-CHANCE LABORATORIES

Service(s) Affected: Building Elevators

Notice Date: 05/14/2015

Building(s) Affected:

Stellar-Chance Laboratories(SCL)
Whole Building Affected: YES


Advisory:
Please be advised that starting on or about Tuesday, May 19, 2015, the Stellar-Chance building elevators will be upgraded. The duration of this project is approximately sixteen (16) months, and only one elevator will be out of service at any given time. These enhancements will improve elevator safety and operation.

EHRS Directive:
N/A




NOTICE:Stemmler Hall Construction Activities: STEMMLER HALL, EDWARD J.

Service(s) Affected: Whole Building

Notice Date: 04/24/2015

Building(s) Affected:

Stemmler Hall, Edward J.(Stemmler)
Whole Building Affected: YES


Advisory:
Stemmler Hall will be undergoing major interior laboratory and infrastructural renovations over the next 3 years. The project team will be scheduling regular Town Hall type meetings to keep building occupants informed during the course of this project. The first of these meetings was held on April 8. The next meeting will be held on May, 20, 2015. If you did not receive notification of the last town hall meeting, please forward your contact information and location in Stemmler to Margo Pietras-Barnes (mpietras@upenn.edu) so that you can be added to our distribution list.

The upcoming meeting will provide an overview of the project, with specific details on the phasing of the work and emphasis on how the construction logistics will be handled in order to mitigate noise, vibration, and disturbance.

The project team recently completed an exercise in which we simulated various construction activities at several locations throughout the building. Our acoustician has been taking baseline readings with a handheld device and has installed accelerometers that will be remotely monitoring the vibration levels throughout the course of the project. We are working with the data gathered by our acoustician and reports submitted by building occupants to determine to type and degree of noise and vibration that is acceptable to building occupants. Please submit any records that you have of observable noise or vibration from 4/13 through 4/17 either electronically to Mike Beatrice (mbeatrice@torcon.com) or to SH Suite 313 so that we can include your information with our other collected data.

EHRS Directive:
N/A